ARKNRGY / Project tracker / Philippines
TITAN V Solar Power Project
Solar, 150 MW, Philippines (Barobo and Tagbina, Surigao del Sur), Development.
- Country
- Philippines, Barobo and Tagbina, Surigao del Sur
- Technology
- Solar
- Capacity
- 150 MW
- Stage
- Development
- Source
- DOE Awarded Solar Projects as of 31 May 2026, 2026-05-31
- First tracked
- 2026-09-24
- Last updated
- 2026-09-24
DOE service contract stage: Development. Potential capacity 150 MW. Mindanao, Region XIII. Accepted bid in the fourth Green Energy Auction (GEA-4 preliminary results, 4 Sep 2025): 49.7 MW (Phase 1) for delivery in 2027, integrated renewable energy and storage system (IRESS): solar with at least 4 hours of battery storage; 49.7 MW (Phase 2) for delivery in 2028, integrated renewable energy and storage system (IRESS): solar with at least 4 hours of battery storage.
Own or develop this project?
Correct the record, or tell us what the project needs: capital, a buyer, a partner, or EPC.
Submit your projectOr email projects@arknrgy.com
Get the weekly deal sheet
New awards, stage changes and financings across Southeast Asia, every week.
Ask an AI about this tracker
Opens your assistant with the tracker already loaded.